Skip to content
A-200 · How the work runs
Fictional concept · Portland, Oregon

BRIEF
TO
BUILDING

Four phases, each with a date on it and something you can hold at the end. Nothing here is a stage gate invented to bill you: every phase closes with an object, and the object is the invoice.

0 — 1 m

Right: the Thursday table — every set leaves through it

Monochrome photograph of four people around a long timber table, writing in notebooks in raking side light
4
Phases, in this order
2–3 wks
To know if you have a building
5 days
To turn a shop drawing round
Every 2nd wk
On site, through completion
Monochrome photograph looking down on a construction deck: a poured concrete slab with a crew standing in a line, and a dense mat of reinforcement bar beyond
How a commission actually runs

FOUR PHASES, EACH WITH A DATE ON IT.

  1. 01Site and feasibility2–3 weeks

    We walk the lot, pull the zoning and the survey, and come back with a one-page memo: what the code will really allow, what the ground will really cost, and whether you have a building at all. Fixed fee, credited against design if you carry on.

  2. 02Schematic design4–6 weeks

    Two directions in plan, both built as card models at 1:100. You get to hold the argument in your hands instead of squinting at a render. We kill one together, usually in the second meeting.

  3. 03Permit and construction set8–14 weeks

    Drawings the city will approve and a contractor can price without guessing. We coordinate structural and mechanical ourselves and we answer the plan-check comments ourselves — you never become the messenger.

  4. 04On siteThrough completion

    Site visits every second week, shop drawings reviewed within five working days, and a punch list we actually close. The last set we issue is the record set: it matches what got built.

Every phase ends with something you can hold: a memo, a model, a set, a building

Phase by phase · what you are holding at the end

THE
OBJECTS

A phase you cannot see the end of is a phase that never ends. Each of the four closes with a thing: a memo you can hand to a lender, two card models, a set the city has stamped, a record set that matches the building.

Monochrome photograph of a sectional card model on a dark ground: two floor plates, a raking roof and fine card rafters
Card model at 1:100 — the second schemePhase 02
Monochrome photograph of a reinforcement cage under construction: dense vertical bars, timber formwork and steel fixers working at height
Column cages, week eleven — Verso HallPhase 04
01

Site and feasibility

2–3 weeks
You leave with
A one-page memo you can hand to a lender
Whose hands
Founding principal, on your site
What it costs
$4,800 flat · credited against design
02

Schematic design

4–6 weeks
You leave with
Two card models at 1:100, and the plan that survived
Whose hands
Principal and the interiors associate
What it costs
First phase of the design fee
03

Permit and construction set

8–14 weeks
You leave with
A permit set, a construction set, and our plan-check responses
Whose hands
Principal — projects
What it costs
Invoiced by phase, never in advance of it
04

On site

Through completion
You leave with
A closed punch list and a record set that matches the building
Whose hands
The associate who drew it, every second week
What it costs
Final phase, invoiced through completion
The calendar · first call to breaking ground

NINE TO
SIXTEEN

Months, and that is the honest number for Portland. Design is three to five of them and it is the part we control. Plan review is the city’s clock: we answer every comment ourselves, and we still cannot shorten the queue.

  • Design

    3 — 5 months

    Feasibility, schematic design and the set. Ours to keep on time.

  • Plan review

    12 — 20 weeks

    The city's clock, not ours. We answer the comments; we cannot shorten the queue.

  • Bid and award

    4 — 8 weeks

    Out to three contractors we know, and we sit with you through the comparison.

  • First call to ground

    9 — 16 months

    The whole of it, said honestly, for Portland.

Two questions · the money ones are on the fee sheet
Asked on the phone

THE TWO
WE ALWAYS
GET

How long from first call to breaking ground?

Nine to sixteen months is honest for Portland. Design is three to five of those; the rest is permitting — plan review alone runs twelve to twenty weeks, and no architect can shorten that. We are licensed in Oregon and Washington and work within a three-hour drive of the studio, because if we cannot be on site every second week we would rather not take the job.

Can you work with the builder we already have?

Yes, and we would rather you brought one in early. If you do not have one we will put the set out to three general contractors we know and sit with you through the bid comparison — the cheapest number is rarely the cheapest building.

Monochrome photograph looking down on a construction deck with reinforcement bar laid out and a crew working across it
Next

THE SAME NINE PEOPLE,
EVERY PHASE.

The person who sketched your stair is the person standing on site when it gets set. That is not a promise a big office can make, and it is the whole argument for a small one.

Fictional concept

LINEA does not exist. The studio, the six projects, the people, the fees and every review on this site were invented by Brimmscale to demonstrate a website.

The photography is licensed stock, greyscaled in the build pipeline and chosen so that every plate shows a material or a fragment rather than an identifiable building by another architect. What is real is the build underneath it.

I want a site like this